Sage was hired as the Design-Builder to both design and construct this upgrade and replacement of an existing outdated and inefficient air handler in the penthouse of its Allentown Campus. The work involved critical measurements and coordinating of various trades to fit all the equipment and accessories into a very small working space. Additionally, the coordination of work required sequencing and scheduling for crane lifts over the weekends due to the cramped site conditions and for moving patients during these critical stages of the project. Lastly, and most important was maintaining hospital operations.

Location : Allentown, PA
Cost range : <$500K
Size : 10,000 SF